May 8th New Economy Industrial Park,Chengdu

Location:Chengdu
GFA:30,428 m2
Client:58 Real Estate (Chengdu) Co., Ltd
The May 8th New Economic Industrial Park is located in Jinjiang District of Chengdu city, close to Jinjiang Avenue. The design is based on the overall planning idea of Chengdu city to vigorously build a beautiful and livable park city and the overall urban design of Jinjiang District as the planning background, and focuses on building an industrial headquarters park with 58.com as the core. The project aims at creating high-quality urban spatial form and comfortable high-quality business district. The headquarters tower creates a double-height green atrium space at the core, connecting with the square to create a new ecological, integrated and interactive office environment.

The facade design gives full consideration to the image of the Internet company, and creates the unique image of 58 Group with simple and active shapes. At the same time, it runs through the ecological concept, and sets up multiple hanging gardens and vertical greening at different heights. The design uses different materials texture, combined with the lines of the podium, concave and convex white frame and glass matching, forming a unified and rich building facade. The city concept of Chengdu park will be organically implemented to become a benchmark industrial headquarters park driven by both industry focus and life consumption.

Related Projects

Bailuwan Town (Lot 3) , ChengduChengdu 2021he project is located in the east into south tuo interchange, Egret Bay new economic headquarters town, location superior. It is only 10min drive to chengdu city center, 20min drive to Shuangliu International Airport and 6min drive to Chengdu East Railway Station. The project site is adjacent to jinyang Avenue and Jinjiang Avenue, which is convenient to connect the central city with Tianfu New Area, and tianfu Airport is accessible to the airport hub at high speed. To maximize the integrity of the shared park, fully excavate the land value, achieve the best matching of resources through the docking and penetration of the axis between the urban interface and landscape resources, and ensure the maximum embodiment of innovation, interaction and ecology of the park. The three-dimensional level divides the use of different functions. Through the vertical partition of the use of different functions, it divides the public open, semi-private and private three-dimensional space, and creates an interactive and integrated, dynamic and efficient high-quality industrial space. The introduction of multi-level and three-dimensional greening system, through the introduction of vertical greening system, responds to the green sharing concept of high-quality scientific innovation space in the new era. The urban interface has been improved. At the present stage, the urban interface of the surrounding areas fails to match the positioning of the area's future high-tech ecological industry. Therefore, it is necessary to enrich the regional urban interface by combining the creation of urban open public nodes and modern characteristic architectural space volume from the consideration of regional integrity. Innovation Base,WuhanWuhan 2020-he project is located in Wuhan. Under the planning of the main axis, the architectural modeling is designed and created by the spirit of enterprise culture. The design takes science and technology ring as the concept and adopts the planning mode of "one ring and one axis", with clear functions and ideas, and forms a multi-layer and varied atrium core. At the same time, the building space is used to provide activity space needed by all staff, improve the quality of life in the park, and create a vibrant, healthy and comfortable atmosphere in the park. Heyuan Biology Pudong Harbor RESEARCH and development Base,ShanghaiShanghai 2020The project is located in the core of Lingang New Area of Shanghai Pilot Free Trade Zone. Located in the southeast corner of Fengxian District, Shanghai, adjacent to Pudong District, fengxian Bay industrial structure development belt and industrial base gathering area. And yuan biology as a rewriting of human genetic engineering unicorn enterprises. Through cutting-edge, orderly and scientific planning, the park provides all employees with boundless communication places and integrated office space. Static hope to present a scientific and technological intelligence, ecological three-dimensional, self-growth, desirable immersive office. Hang yun building,GuangzhouGuangzhou 2020The project site is located in Guangzhou, and the planning structure is superior to the core of cultural and creative industry. In terms of industrial structure planning, the project belongs to the media creative industry zone and the central axis of the new city. Haizhu District is one of the key urban areas for future development, but it is difficult to develop because of the complex ownership of land and many existing buildings. The project land has good construction conditions, is located in one of the core of regional planning, is expected to be a key project. This project integrates business, office, publishing, conference and other multi-function formats into one, vertically and orderly stacking of each format. Through the interconnection and sharing of multiple highlight functions in the vertical space, each other is stimulated, mutual value-added effect is generated, and the value of the overall format is improved. The design breaks the traditional setting of single ground floor and creatively shapes six "ground floor" Spaces. Through multiple vertical transportation systems such as flying ladder, shuttle ladder and enterprise ladder, it guides people upward to each ground floor, activates and enhances commercial value and realizes the concept of "+" space with value-added effect. Jiaotou Land International Innovation Center,ChengduChengdu 2018-The project is located in the Central Business District of Tianfu New District, Chengdu, and is a major industrial project in this area. The land is located at the intersection of the central ecological belt and the east-west axis ningbo Road, so the geographical position is extremely important. With a total floor area of 210,000 square meters, it is divided into two 35-story and 45-story super high-rise towers with building heights of 160 meters and 220 meters respectively. Adjacent to the Southwest headquarters of China Railway, the project faces the Belt and Road Building in the east, the Central Business ecological belt in the south, and tianfu Central Park in the distance. Both landscape value and location value have a strong first-mover advantage. Upon completion, the project will become an important international innovation center of intelligent transportation and a landmark corporate headquarters building in the region.
WeChat

Use WeChat Qr code on the right side , pay attention to our WeChat immediately
Share This Page

Use WeChat Qr code on the right side , share this page with your friends

If you have any comments or questions about the text, pictures and other contents of the website, please contact: webfeedback@cendes.design

©2021 Cendes 蜀ICP备10202716号  川公网安备 51010402001114号